Mike and Carrie Zaitz are renovating an old Methodist Church in Grindstone City, Michigan. Mike claims he just wanted a place to work on his art. He sold Carrie on it, since she's usually up for adventures. From that happy December of 2011 till now, the investment in time and money has seen the church rebuilt from its glorious bones into a work of art, in progress. Carrie is documenting the process because, well, it's easier to hold a camera than to hold an edging sander. She's done both, because she is having an adventure, but it is Mike who drives this project with his intelligence, talent and energy. Together they are working toward creating an art gallery. A gallery which holds objects of beauty and inspiration, but which always points back to the source, our heavenly Father.
Showing posts with label progress. Show all posts
Showing posts with label progress. Show all posts

Monday, February 23, 2015

Ode to an Arch

We're working on the Arch.
It has served as a backdrop since we bought the church. This is how it first appeared:

Where's the Arch? December 2011
Removal of the dropped ceiling revealed:

Oh there is is!   February 2012
Yikes.
We tried to pretty it up! 
Quaint it up with a rocker!  April 2012
Yeah, I guess. It was temporary. 

And as long as we're in memory lane, when Mom turned 70, we dressed up the chaos and had a birthday party. Again, the Arch was the backdrop.
Good times,  July 2012!
I remember mopping that nasty floor with rainwater to try to get the worst of the ancient filth off. It sort of worked!

Pre Party Arch July, 2012
By December of 2012, It looked like this: 

December, 2012 Chaos

Then the fancy table was replaced with  picnic table. In case we wanted to have a picnic. 

Uh, aren't picnics held outside? April, 2013
Yes, so I we exchanged the picnic table for a bed! A futon, in case we got tired and had to nap, apparently. 

Perfect place to take a nap! Ha! July, 2013
Yeah, and as you can tell, we have a continual storage problem. We fixed the storage of the futon problem by finally getting rid of it. After three decades, it's time to ditch the College Futon. Sniff.

Next came the Big Demolition, and we had a bare bones situation.


Uncovering the Arch! August, 2013
Later that same day - actually about 15 minutes later, we had this:
Hey now! 
Closer inspection:

Naked Arch, August, 2013
Behind those enormous planks is nature. Cool, raw nature.  These are truly the bones of the church. Which is fine for August, but by Fall..

The Church's long underwear! October, 2013
We needed some protection from the elements. Yes, it was a happy day! 
Warmth!

Insulation by spray foaming. Next comes the drywall. And not soon after! 
Later that same month, 2013
Drywall! Then Mike and Dad put up nailers on the arch in several death defying maneuvers. 

Here's Mike finishing up.

December 2013

And then… a whole year went by… what happened to 2014? Well, there were ceilings to paint, floors to sand, trim to put up, caulk to stuff, windows to fix…


March 2014, Edge on Arch

Sanding,  April 2014
The Arch also became a bit of an Art supporter.
September 2014
And so it has been till this month, February of 2015. We keep rearranging and cleaning, trying to keep the Church work-wise. But we're not done with the Gallery, so the art must go!


And so, it's February of the self-same year the White Church Gallery is set to open. 2015.

YIKES!!!!

We need to pedal a little faster!

So now we have begun an art/science project.
I'm a scientist by nature, and Mike's an artist. But he's also an engineer, so that's like a scientist. And I have a musical nature, so that's artistic, right? Hence the art/science project that we are in the midst of. What to do with the arch!
Cherry and Pine. What say you?
This is only the beginning. As I type this, my soul mate is over yonder drawing up the arch on his CAD program and figuring out dimensions, beveling, and molding ideas. He's trying to figure out how to make this arch a piece of art. There will be more to this story. Stay tuned.




Friday, August 16, 2013

Pardon Our Dust!

The walls have come tumblin' down. But not without a lot of coaxing, urging, and back breaking labor!
First step: prep. I spent a day solo moving all the furniture and tools into two aisles so that the walls were clear. I felt very empowered after the move.The place was a mess, as you see.
Bird's-eye Before shot
Better...two aisles.
Wall almost clear...
Except for the massive piano harp. That will take two. 




















Shrouded for now.


Step two: start ripping out plaster and lathe. Scaffolding set up, tools assembled. Masks on, ready, set, go!

Here's the "time lapse" of the wall coming down.




Grime doesn't pay!
We can breathe easy now!

Third step: down in the trenches, shoveling plaster and lathe, taking it out to the dumpster, and back for more.



Tired. Empowered!
One wall down, three to go. That's enough for one weekend...

Step four: Time for some eats and drinks! Step it up, Captain Barbeque!

"With or without plaster dust?" "Without, please!"


Friday, December 28, 2012

Church on Mars

Well, technically the Church is still in Grindstone City, Michigan, but the landscape has changed.

Early in the summer, I was excited to mow the church plot of land with the John Deere.
Green!

Then came the Big Heat! By the Party in late July, little green was left... except for the army green Party tent!
Summer '12: 23-50-70 Birthday Party

And then the road came in. First step in having a paved road:

What will be unearthed? Worms!
Progress and parking.

Check out the fancy cash I mean catch basin! 
So we're still in Grindstone landscape, albeit slightly modified. 

Then comes the Heat! As summer wanes to fall and then rushes into winter, the need for heat becomes real. The steamy hot hot summer becomes icy windy cold cold winter!

So we pried open our wallets and went with Geothermal heat. B and D were our contractors.

So we're gonna take the warmth from the earth, see....
First, we'll need more electricity. Dig 'er up, boys...


And inside?
New electrical boxes

Then come the pipes, underground, of course!
Dig 'er up, boys...

Now we're on Mars!
Here's the theory:

Here's the reality:


And the unit. This is what takes the warmth from the ground and transfers it to the church's environment. Likewise, in the summer it will take the cooler-ness of the earth and pump it back into the Church. The difference in temps will be made up by the electrical part of the unit, but heating from 55 (earth temp) to 65 is better than heating from 0 (air temp) to 65! That's the theory.



And though I thought about it for awhile, this is the best I could do to show you what heat looks like!!


But this is what heat feels like:

We did the right thing!